• HOME
  • ABOUT
  • RENDERING
  • CMG DESIGN | BUILD
  • CONTACT
Menu

CMG workshop, LLC

custom residential coastal architecture
  • HOME
  • ABOUT
  • RENDERING
  • CMG DESIGN | BUILD
  • CONTACT

12 Days of Christmas for the Engineer/Cost Estimator

December 25, 2011
Here is a breakdown of what it would cost, both by item and by day, to implement the 12 Days of Christmas song. Thanks to PNC bank for 2011 costs.



← Establishing Goals - 201212 Days of Christmas for the Engineer/Cost Estimator →